30MW Solar PV Project
Advised juwi Renewable Energy on its temder response to First Solar for the engineering, procurement and construction (EPC) contract for Greenough River Solar Farm Stage 2.
Project Details
Location
Client
Advised juwi Renewable Energy on its temder response to First Solar for the engineering, procurement and construction (EPC) contract for Greenough River Solar Farm Stage 2.
Select your desired option below to share a direct link to this page