132kV Transmission Line
Powerlink Transmission EPC superintendent – Advised Ener‑G, appointed by Powerlink, on contract interpretation and administration for the engineering, procurement and construction (EPC) of a 132 kV transmission line.
Project Details
Location
Client
Powerlink Transmission EPC superintendent – Advised Ener‑G, appointed by Powerlink, on contract interpretation and administration for the engineering, procurement and construction (EPC) of a 132 kV transmission line.
Select your desired option below to share a direct link to this page